A Vision Taking Shape: The Main Floor Design Sketches Are Here
Our designer's eye for detail is showing We are so happy to be working with a talented interior designer who is helping bring our vision for Chayala's Mikva to life. The first sketches of the main floor layout are here, and they capture the heart of what this building...
Building the Basement Stairs
Progress continues, one step at a time. Inside Chayala's Mikva, the latest step forward is a literal one — the basement stairs are being built. What was once an open gap is now taking shape into a real, finished staircase, connecting the lower level to the rest of the...
Sheetrock Is Up — And the Lights Are Coming On
Another milestone reached inside the building. The progress inside Chayala's Mikva keeps moving forward, and this month brought two exciting steps: sheetrock is up throughout the building, and the first lighting fixtures are beginning to go in. With the walls now...
Walls Continue: Insulation Is In, Sheetrock Coming Next
The rooms are taking real shape. Inside Chayala's Mikva, the progress this summer has been steady and exciting to watch. What began as open framing is now filling in, room by room, with the structure that will soon become the private, peaceful spaces women will use on...
Progress All Around: The Roof and the Rooms Are Coming Together
Summer has brought steady, beautiful progress. The building continues to grow into itself, and this summer's work has been all about bringing the vision closer to reality — above and within. The rooftop is really taking shape now — a place for women to step outside,...
Up on the Roof: New Spaces Are Coming to Life
The building is rising — inside and out. The progress at Chayala’s Mikva is visible from every angle — inside and out. A new roof has been completed on the lower level, and it’s becoming more than just structure. This rooftop will be a peaceful outdoor space for women...
A Look Inside — The Mikva Design is Here
We’re excited to share the layout design of Chayala’s Mikva. For the first time, you can see the full picture — the mikva pool, preparation rooms, changing rooms, and sitting area, all laid out by our designer. Every space has been carefully planned to give the women...
The Oitzer is Built
A major milestone in the heart of the Mikva. The oitzer has been completed. This sacred rainwater reservoir is the halachic cornerstone of every kosher mikva — collecting rainwater that connects directly to the main pool and gives the mikva its validity. For Chayala’s...
The Heart of the Mikva is Taking Shape
The walls are rising — and every act of support brings us closer to something eternal. There's a moment in every great project when you can feel the vision becoming real. We are living that moment right now. After completing the cradle, the team laid an insulation...
A Meaningful Day: Planning the Second Floor
Creating a Space for Women to Connect, Learn, and Gather Together This past week brought a heartwarming development at Chayala’s Mikva, as members of the women’s committee gathered on-site to envision the future of the second floor. Together, they discussed how this...